Munchkin 399M Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Bojler Munchkin 399M. Munchkin 399M User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 44
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
HEAT TRANSFER PRODUCTS, INC.
120 BRALEY RD., E. FREETOWN, MA 02717
Installing, Operating & Maintaining
MUNCHKIN™ HIGH EFFICIENCY
399M COMMERCIAL BOILER
Do not store or use gasoline or other flammable vapors and
liquids in the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switch: do not use any phone in
your building.
Immediately call your gas supplier from a neighbor's phone.
Follow the gas supplier's instructions.
If you cannot reach your gas supplier, call the fire department.
Installation and service must be performed by a qualified
installer, service agency or the gas supplier.
WARNING
If the information in this manual is not followed exactly, a fire or explosion may
result causing property damage, personal injury or loss of life.
WARNING
This manual must only be used by a qualified heating installer / service
technician. Failure to comply could result in severe personal injury, death or
substantial property damage. It is also important to keep these Instructions
with the appliance.
MH27745
CONTROLS
Zobrazit stránku 0
1 2 3 4 5 6 ... 43 44

Shrnutí obsahu

Strany 1 - 399M COMMERCIAL BOILER

HEAT TRANSFER PRODUCTS, INC.120 BRALEY RD., E. FREETOWN, MA 02717Installing, Operating & MaintainingMUNCHKIN™ HIGH EFFICIENCY399M COMMERCIAL

Strany 2 - USING THIS MANUAL

10WARNING Failure to follow all precautions could result in fire, explosion or death!GAS CONNECTIONremoving the cap and installing the manometer. The

Strany 3 - TABLE OF CONTENTS

11VENTINGPART 4. VENTINGA. GENERAL1. Install the boiler venting system in accor-dance with these instructions and with theNational Fuel Gas Code, ANSI

Strany 4 - PART 1. GENERAL INFORMATION

12VENTINGLocation of exit terminals of mechanical draft and direct-vent venting systems.(Reference: National Fuel Gas Code ANSI Z223.1/NFPA 54 2002).F

Strany 5 - GENERAL INFORMATION

13D. EXHAUST VENT AND INTAKE AIR PIPE SIZING1. For the 399M the exhaust vent and air intakepipes should be 4" Schedule 40 or 80.2. The total comb

Strany 6 - PART 2. ELECTRICAL

14VENTINGF. HEATER REMOVAL FROM A COMMON VENT SYSTEMAt the time of removal of an existing heater, the following steps shall be followed with each appl

Strany 7

VENTING15**IMPORTANT NOTE: All vent pipes must be glued, properly supported and the exhaust must be pitched a minimum of a¼" per foot back to the

Strany 8 - PART 3. GAS CONNECTION

16**IMPORTANT NOTE: All vent pipes must be glued, properly supported and the exhaust must be pitched aminimum of a ¼" per foot back to the heater

Strany 9 - GAS CONNECTION

17VENTING / PIPINGG. CONDENSATE REQUIREMENTSThis is a condensing high efficiency appliance, therefore this unit has a condensate removal system.Conde

Strany 10 - WARNING

pound. Threaded connections are 2” NPT Brass nipples located on the left hand side of unit. 2. Connect the system supply marked “Heater Out”, make sur

Strany 11 - PART 4. VENTING

19PIPINGC. FILL AND PURGE HEATING SYSTEM • Attach the hose to balance and purge hose connector or drain valve and run hose to near-est drain • Close t

Strany 12

USING THIS MANUAL2SPECIAL ATTENTION BOXES Throughout this manual you will see thesespecial attention boxes similar to this one,which are intended to

Strany 13 - INSTALLATION

20PIPINGPiping Symbol Legendcirculator (w/ isolation flanges)gate valveglobe valveball valveswing-check valveflow-check valvespring-loaded check valve

Strany 14 - DANGER

21PIPINGStandard Munchkin boilerRetrofit piping (zoning with valves)Space heating modeMunchkin boilerP1Super Storindirect DHW tankT/PDrawing 1Amake-up

Strany 15 - DIAGRAMS FOR SIDEWALL VENTING

22PIPINGStandard Munchkin boilerRetrofit piping (zoning with valves)Domestic water heating modeMunchkin boilerP1Super Storindirect DHW tankT/PDrawing

Strany 16 - DIAGRAM FOR VERTICAL VENTING

23PIPINGStandard Munchkin boilerPreferred piping (zoning with valves)Space heating modeMunchkin boilerP1Super Storindirect DHW tankT/PDrawing 2Amake-u

Strany 17 - PART 5. PIPING

24PIPINGStandard Munchkin boilerPreferred piping (zoning with valves)Domestic water heating modeMunchkin boilerP1Super Storindirect DHW tankT/PDrawing

Strany 18 - 399M 1400-50 UPS 32-160 PL-55

25PIPINGStandard Munchkin boilerPreferred piping (zoning with circulators)Space heating modeNOTES:1. This drawing is meant to show system piping conc

Strany 19 - CAUTION

Standard Munchkin boilerPreferred piping (zoning with circulators)Domestic water heating modeMunchkin boilermake-up waterSuper Storindirect DHW tankcl

Strany 20 - Piping Symbol Legend

27PIPINGFig. 5-9Standard Munchkin boilerPreferred piping (multiple boilers / zoning with circulators)Space heating modeNOTES:1. This drawing is meant

Strany 21 - Drawing 1A

28PIPINGStandard Munchkin boilerPreferred piping (multiple boilers / zoning with circulators)Domestic water heating modeNOTES:1. This drawing is mean

Strany 22 - Drawing 1B

29START-UP PROCEDURESPART 6. START-UP PROCEDURES A. ITEMS TO BE CHECKED BEFORE LIGHTING THE MUNCHKIN It is recommended that you read the General Infor

Strany 23 - Drawing 2A

TABLE OF CONTENTS3TABLE OF CONTENTS PART 1 . . . . . . . . . . . . . . . . . . . . . .4 thru 6GENERAL INFORMATIONA How It Operates . . . . . . . . .

Strany 24 - Drawing 2B

30START-UP PROCEDURES4. Do not use this appliance if any part has been under water. Immediately call a qualified serv-ice technician to inspect the ap

Strany 25 - Drawing 2C

31E. STATUS MENUInstallers are also able to check the current status of the Munchkin parameters by pressing S4/RESETkey for 3 seconds. Once activated

Strany 26 - Drawing 2D

32PART 7. SERVICINGA. SEQUENCE OF OPERATION1. When power is first applied to the control, the control display will read the outlet tempera-ture. The c

Strany 27 - Drawing 2E

33SERVICINGclosed. This could occur if the clear hose, which is connected to the outlet of the fan is disconnect-ed. This can be corrected by re-conne

Strany 28 - Drawing 2F

34SERVICINGedoCnoitpircseDnoitaruDnoitcAevitcerroC00EdedeecxEtimiLhgiH.ceS05.1.2.3.noitarepopmupnoitalucrickcehCehthguorhtwolfetauqedasierehttahteruss

Strany 29 - PART 6. START-UP PROCEDURES

35SERVICINGTable 7-2: 925 Control Board FAULT CodesedoCnoitpircseDydemeR00F.dedeecxEtimiLhgiH.1.2.3noitarepopmupnoitalucrickcehCehtgnisseccaybreliobeh

Strany 31

37MAINTENANCEPART 8. MAINTENANCEA. MAINTENANCE PROCEDURESPeriodic maintenance should be performed once a year by a qualified service technician to ass

Strany 32 - PART 7. SERVICING

38MAINTENANCEin which case, a qualified plumber will need to be contacted to follow the Coil Cleaning Instructions(Section D) included in this section

Strany 33 - SERVICING

39MAINTENANCECONTROL WIRING LAYOUTFig. 8-1*There is a spare 6.3 amp “slow blow” fuse included on the control cover. HTP p/n 7250-378 oryou may purchas

Strany 34

GENERAL INFORMATION4B. MUNCHKIN RATINGS AND DIMENSIONSPERFORMANCE RATINGCONNECTION SIZESRECOMMENDED SERVICE CLEARANCESledoMnoitaludoMtupnIgnitaeHEODyc

Strany 35

40MAINTENANCE

Strany 36

41MAINTENANCE

Strany 37 - PART 8. MAINTENANCE

42TYPICAL MUNCHKIN BOILER INSTALLATIONNOTE: THIS DETAIL IS MEANT TO SHOW A TYPICAL INSTALLATION. THE INSTALLER IS RESPONSIBLE FOR ALL EQUIPMENT DETAIL

Strany 38

43Installation Checklist for Munchkin BoilersQuestions relating to electrical1. Is there continuous 120 volts line voltage supplied to the unit?2. Is

Strany 39

SuperStor Ultra, SuperStor, Voyager, Voyager Sanitizer, and Everlast are registered trademarks of Heat Transfer Products, Inc.© 2006, 2005 Heat Transf

Strany 40 - MAINTENANCE

5GENERAL INFORMATIONDIMENSIONSC. PRE-INSTALLATION REQUIREMENTSThe Munchkin is designed for installation on non-rated flooring, in alcoves, basements,

Strany 41

6GENERAL INFORMATION / ELECTRICALNOTE: It is important to refer to the site installation checklist in the back of the manualto assure proper and effec

Strany 42 - REQUIRED BY LOCAL CODES

7ELECTRICALC22.1, or to the applicable codes and standards. For your convenience, we have labeled all the wiresthat need to be connected to operate th

Strany 43

PART 3. GAS CONNECTION8WARNING Failure to follow all precautions could result in fire, explosion or death!ELECTRICAL / GAS CONNECTIONFigure 2-3: For

Strany 44

9GAS CONNECTIONA. GAS CONNECTIONThe gas supply shall have a maximum inletpressure of less than 14" water column (350mm), ½ pound pressure (3.5 k

Komentáře k této Příručce

Žádné komentáře